Close Menu
    Trending
    • Putin & Zelensky Will Not Attend Face-to-Face Peace Talks in Istanbul, Trump Open to Making the Trip | The Gateway Pundit
    • Trump renews third-term talk in troop rally in Qatar
    • What’s at stake in US Supreme Court birthright citizenship case? | Donald Trump News
    • Three Yankees prospects who look ready to make the jump
    • You can’t prevent an economic recession, but you can ensure you're financially prepared to weather one
    • How to ace almost any behavioral interview questions
    • Gazans Once Escaped To Rafah. Now Israel Is Razing It.
    • France Proposes 500% Tariff On Russian Oil
    The Daily FuseThe Daily Fuse
    • Home
    • Latest News
    • Politics
    • World News
    • Tech News
    • Business
    • Sports
    • More
      • World Economy
      • Entertaiment
      • Finance
      • Opinions
      • Trending News
    The Daily FuseThe Daily Fuse
    Home»Opinions»Power grid: Don’t delay important work
    Opinions

    Power grid: Don’t delay important work

    The Daily FuseBy The Daily FuseMay 10, 2025No Comments1 Min Read
    Facebook Twitter Pinterest LinkedIn Tumblr Email
    Power grid: Don’t delay important work
    Share
    Facebook Twitter LinkedIn Pinterest Email


    Thanks for the editorial “The Northwest power grid may soon max out. We must act” (Might 4, Opinion). Elevating consciousness of this crucial want is necessary. Elementary options embody extra demand-side sources and including superior know-how to broaden use of current transmission infrastructure.

    Past these important options, our future grid is like filling up a restricted container with rocks: You do massive rocks first. For Washington, that’s extra capability over the Cascades so demand alongside the Interstate 5 hall can use renewable sources to the East. Equally necessary is bigger connectivity with the bountiful, numerous and highly effective wind sources in Montana which might be crucial to satisfy our clean-energy targets.

    The Bonneville Energy Administration and our main utilities have acknowledged these wants for many years, however concern of the issues concerned hold delaying these most necessary transmission initiatives within the state.

    Doug Howell, Seattle

    Letters editor: If you need to share your ideas about this letter or on different points, submit a Letter to the Editor of not more than 200 phrases to be thought of for publication in our Opinion part. Ship to: letters@seattletimes.com



    Source link

    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
    The Daily Fuse
    • Website

    Related Posts

    UW vandalism: Destruction is not freedom of speech

    May 15, 2025

    Welcome transparency for Climate Commitment Act

    May 15, 2025

    WA’s journalism fellowship in limbo after legislators cut funding

    May 15, 2025

    Pope Leo XIV: Praying for return of lost tradition

    May 15, 2025
    Add A Comment
    Leave A Reply Cancel Reply

    Top Posts

    Bravo Expands ‘Real Housewives’ Franchise With Rhode Island

    May 7, 2025

    Hawks star named as All-Star replacement

    February 10, 2025

    Elon Musk Calls Out “Violence and Hatred” Against Tesla from the Left: “They’ve Gone Psycho” | The Gateway Pundit

    March 31, 2025

    “If the US Insists on Its Own Way, China will Fight to the End” – China Says It Will Not Bow Down to Trump’s Tariff Threats | The Gateway Pundit

    April 8, 2025

    Russian Election Expert Grigory Melkonyants Sentenced to 5 Years in Prison, State Media Report

    May 14, 2025
    Categories
    • Business
    • Entertainment News
    • Finance
    • Latest News
    • Opinions
    • Politics
    • Sports
    • Tech News
    • Trending News
    • World Economy
    • World News
    • Privacy Policy
    • Disclaimer
    • Terms and Conditions
    • About us
    • Contact us
    Copyright © 2024 Thedailyfuse.comAll Rights Reserved.

    Type above and press Enter to search. Press Esc to cancel.